Calais Port 2015 Site delivery

05May2021

The Design and Construction Joint Venture represented by Philippe AMEQUIN, Managing Director of Bouygues Travaux Publics and the Project Company represented by Olivier BRAMAUD-GRATTAU, Chairman of Société des Ports du Détroit, proceeded to the symbolic acceptance of works of Calais Port 2015 construction site in the presence of the Hauts-de-France Region, owner and grantor, represented by Xavier BERTRAND, President, and Société d’Exploitation des Ports du Détroit, the Concessionaire, represented by Jean-Marc PUISSESSEAU, Chairman and Managing Director.
Taking a bus ride along the future passenger route, the guests were able to appreciate the fluidity, safety and services that will be available to future users of this new terminal opening this autumn 2021. François QUANDALLE, Calais Port 2015 Project Director and Laurent DEVULDER, Chief Executive Officer of Société des Ports du Détroit, highlighting the main characteristics of this major project which took almost 6 years to be completed and the interest of such a large-scale project, thought out since 2002 for the future port of Calais and highly structuring for the area.