Nearly 10 hectares reclaimed from the sea

In July, the junction between the R3B cavalier and the breakwater created a basin.
After this summer dredging, the basin is now almost filled and nearly 10 hectares have been reclaimed from the sea.

Dredging and spectacular backfilling